The loading point with railway scales facility with with dimensions in axes 28.1m x 19m and height of 32.5m is a the finishing touch at Inaglinskaya-2 anddesigned to load wagons with coal that had been through all stages of processing through other facilities at Inaglinskaya-2

TYPES OF WORKS COMPLETED IN THE PROCESS

OF CONSTRUCTION

  • Development and loosening of group 3 soils,
    in volume of 2803.39 m3
  • Installation of 79 drilling piles 16m to 18m
    in length and 425.27 m3 in volume
  • Reinforced concrete structures installation
    in volume 512,96 m3
  • Manufacturing, delivery and installation of 815,39
    tons of metal structures
  • Technological equipment and systems installation

DURINGTHE ENTIRE PERIOD OF CONSTRUCTION WE USED THE FOLLOWING:

The works were made of reinforced concrete structures - heavy concrete of compressive strength class B35, grade F400 for frost resistance, W10 for water resistance on Portland cement according to GOST 10178-85-85*. Reinforced steel for foundations is classified and accepted according to A500C by GOST R 52544-2006 and A240 by GOST 5781-82*.

High-tech equipment was used - belt stationary conveyors for prompt transportation of processed commercial coal, boring machines, switchgears, dosing hoppers, storage hoppers, electric hoists and winches, tansometric wagon scales, etc.

Processed commercial coal, which passes through the entire system, is unloaded into wagons for further transportation along the railway tracks.