TUNNEL, CORRIDOR, CONVEYOR GALLERY FROM THE WAREHOUSE OF GOODS TO LOADING POINT AT INAGLINSKY ENRICHMENT PLANT
in the Republic of Sakha (Yakutia), the city of Neryungri
MAIN CHARACTERISTICS FO THE CONSTRUCTION SITE
TYPES OF WORKS COMPLETED IN THE PROCESS
OF CONSTRUCTION
Development, loosening of soils (group 3) for tunnel sections
Backfilling with pit compacting
Construction of 4 sections of the tunnel with evacuation exit;
Installation of flooring with topcoating
Performing of works according to engineering systems (Sections CQ, VC, EO, EM, SS, SAR, TX).